« Bailey Park Clean-up & Picnic Saturday, April 23 (archived content) | Main | Taming The Teardown Trend (copy courtesy of WANG) »

October 30, 2007

Shoal Creek Wastewater Improvements Project (archived content)

Residents and property owners living near and on West 32nd Street, West 33rd Street, Churchill and Kerbey Lane will experience construction of a replacement wastewater line in their streets during the summer. This project is necessary to eliminate sewer overflows, and is one of about 00 wastewater construction projects taking place citywide. Construction is taking place on the Bryker Woods neighborhood part of the project during the 2005 summer break to prevent disruption of Bryker Woods Elementary School personnel, students and parents. The contractor will begin to mobilize after Memorial Day (May 30) with intent to conclude (except for final street repairs) before school begins in mid August. The construction of the replacement wastewater line includes reconnection of residents’ home services to the replacement line in the street. Residents will be able to enter and exit their driveways during construction but through traffic will be diverted. Streets and driveways will be accessible to emergency vehicles and trash pick-up will continue as normally scheduled. Full road closures with detours will be necessary as part of the traffic plan in addition to some opportunities to use only partial lane closures as sewer lines are replaced. Construction activities will move from block to block so that road closures do not impact the entire street.

See neighborhood ACWP construction map
The Project Manager is Stan Evans at 479-1636.
The Construction Inspector is Brian Reese at 554-3218
The Austin Clean Water Program hotline is 684-3204
To report sewer overflows, please call 972-1000

For information about this and other community construction projects, please go to http://www.cityofaustin.org/ca.

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/t/trackback/2653275/22903426

Listed below are links to weblogs that reference Shoal Creek Wastewater Improvements Project (archived content):